- test_cancellation_full_path_queued_immediate_and_dispatched_collaborative
exercises the full public-API cancellation path: immediate cancel of a
queued task, collaborative cancel of a dispatched task surfaced through
lease renewal and a cancelled terminal report, and visibility of the
cancelled status via both the get and list endpoints.
- Full backend suite (869 passed, 50 skipped) and cloud-console frontend
suite (27 passed) + typecheck show no regressions; the only failures are
4 pre-existing live-LLM integration tests unrelated to this change.